The main wiring and plumbing runs have been done (known as the first fix) and the pipe work has been capped and pressure tested...
The plaster work is both types here, lime with horse hair on all the stone work... (two base and one finish coat).
Then modern plaster on all the plaster board work, also two coats of skim with taped board joins.
Comments